ACC 0.49 THB +0.01 (+2.08%)

Solar Rooftop

In 2015, the Company initially invested by co-develop the greenfield solar rooftop projects together with our partner, Wyncoast Industrial Park Public Company Limited, and become the shareholders of solar rooftop companies

Solar Rooftop Project

Aug 2015       Invest 49% in W.Solar Co., Ltd., registered share 80 MB

Phase                       Phase 1                                           Phase 5                                                    Phase 6

Type:                      Solar Rooftop                                 Solar Rooftop                                       Solar Rooftop

Location:               Bangpakong, Chachoengsao       Bangpakong, Chachoengsao             Bangpakong, Chachoengsao

Capacity:               0.99 megawatt                               0.186 megawatt                                    0.108 megawatt

COD Date:            5 Jun 2015                                       1 Apr 2017                                             1 Apr 2017

 

 

Aug 2015       Invest 51% in Bangpakong Solar Power Co., Ltd., registered share 49 MB

Type:                      Solar Rooftop

Location:               Bangpakong, Chachoengsao

Capacity:               0.75 megawatt

COD Date:            1 Feb 2017

PHOTO GALLERY

CSR & NEWS

ACC Group “Pun Khwam Suk 2023”

Advance Connection Corporation Co., Ltd. donated ceiling fans to Pak Phanang School Nakhon Si Thammarat Province

error: Content is protected !!